Our research team has used “work smarter” to mean lots of things:

  • Find a better, simpler way, that makes a task or event easier to repeat with high consistency
  • Think about how to streamline to reduce effort and save time
  • Get it done so we can use the found time for our passions

We love productivity tips and Lean improvement tools equally. We want to compress the total “task time” required during a work week while still delivering excellent results. Reducing the task time frees us to be creative. It also gets us out of the office or lab to attend intriguing seminars, to flexibly meet family needs, be physically active, run errands, and to read, think, relax, and recharge. Those activities make us more effective at work and in life. We are actively rejecting the zillion hour work-week.

We’re aiming for predictability in essential operations and protected time to concentrate and explore. Admittedly this takes constant cultivation to avoid ruts. We hope to reinforce that respecting each individual’s time means it shouldn’t be wasted on interruptions, inefficient processes, poor communication, or interminable meetings. We like to talk about how to work smarter – it’s liberating.

This week we met the dark twin of #worksmarter up close and personal. This is the version that is rejected when it crops up in time management blogs and tweets when it is code for pressurized work or for filling every moment of the whole day, and night, with tasks (such as the metaphor of big rocks, smaller rocks, and then pouring sand around them to fill all the spaces).

Here’s our story:  A team member who serves in a key role across research groups was told her salary support for the role in another team’s work needed to be reduced. We were confident she was giving more time, including personal time, than currently covered on the grant because she was dedicated to the research question and to the research population.

To maintain her contributions and match the needs of the project, and to be in compliance with effort reporting, something had to give. Senior investigators across projects conferred. Unilateral insistence ensued that a dedicated, engaged research team member would have to “work smarter” and just “figure out how to get the recruitments done in less time.” Work flow was examined, schedules were reviewed, time in transit to patient visits was assessed and both teams agreed it was a tough puzzle because the responsibilities needed more time not less.

Work smarter CANNOT include:

  • Expecting the most junior (students, postdocs, early career investigators) to fill all personnel gaps and shoulder any demands made on them.
  • Assuming the work load is acceptable if projects are being accomplished.
  • Normalizing personal sacrifice as a requirement for being a “team player” or being invested in one’s career.
  • Celebrating heroics of having a restricted life outside of work, sleeping in the lab multiple nights, etc.
  • Failing to properly budget for researchers and staff on projects and wanting all involved to “figure it out.”

For our story the negotiation proceeds and we’re not at a satisfactory conclusion. But the immediately above version of work smarter doesn’t work. It is a recipe for demoralizing talented individuals and for burn-out among those who care most about their work and are already prone to over-extend themselves. The external challenges in research are substantial enough that we should be girding ourselves and our teams to withstand and thrive under pressure, not expecting gratitude for work that becomes undoable. We need to stay vigilant, gauge these pressures, and be sure to have escape valves that allow all team members to speak up and ask for solutions that reject heroics. Team meetings need feasibility check-ins.

We cannot trap our staff and faculty in over commitment and imply blame that they are not smart enough to do their work properly. Now we’re at a loss for a new rallying cry. Work smarter is starting to leave a bitter taste.

Want to live on the Edge?

Register


Join the conversation


Saving subscription status...

1 Comment

? Preach, Mentor. I have been on several large grants that got cuts and the way those cuts were handled were a real wake up call to how things were going to proceed for the rest of the project. After taking a 15% across the board cut, one team leader told us all to ‘hunker down’ and streamline. I was very junior and had no idea what that meant other than the fact I just lost 15% of my experimental time and personal effort. When I was at the lead of a different project that got slapped even harder (20%), I called my program officer and outlined what experiments weren’t going to happen because I had no way to pay for 80% of a trainee. I added this to my progress report every year and for several of the years, my program officer was able to slide me some extra money at end of budget time.
On the clinical side, it’s been equally ugly. I saw a chairman tell a department they faced salary loss if they didn’t add another clinic slot every other half day. The junior faculty sitting next to me started crying. Not crazy wailing, but the small gasp and stuttered inhaling of a new parent who was studying for their boards. I usually will reach out to people who are crying and tell them ‘everything will be okay’. It’s sort of my go to mantra. I reached out, but didn’t say this. I’m equally stumped on how to make these things okay.

You May Also Like